Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-2269

User Task Duration Reports show non-user task flow nodes

    XMLWordPrintable

    Details

    • Type: Bug Report
    • Status: Done
    • Priority: L3 - Default
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 2.5.0
    • Component/s: backend
    • Labels:
      None

      Description

      given:

      • I have a user task duration view report

      when:

      • I group by flow nodes

      then:

      • I see results for all flow nodes

      expected:

      • I probably should not see all flow nodes, but only user task flow nodes.

      Hint:

      • We need to think about what to do with the Show Flow Node configuration in the user task view.
      • Create a separate front-end ticket for the issues Sebastian mentioned in the comment.

        Attachments

          Issue Links

            Activity

              People

              Assignee:
              Unassigned
              Reporter:
              felix.mueller Felix Müller
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved: