Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-2269

User Task Duration Reports show non-user task flow nodes

    XMLWordPrintable

Details

    • Bug Report
    • Resolution: Fixed
    • L3 - Default
    • 2.5.0
    • None
    • backend
    • None

    Description

      given:

      • I have a user task duration view report

      when:

      • I group by flow nodes

      then:

      • I see results for all flow nodes

      expected:

      • I probably should not see all flow nodes, but only user task flow nodes.

      Hint:

      • We need to think about what to do with the Show Flow Node configuration in the user task view.
      • Create a separate front-end ticket for the issues Sebastian mentioned in the comment.

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                felix.mueller Felix Mueller
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Salesforce