Skip yarn build in e2e stage

XMLWordPrintable

    • Type: Task
    • Resolution: Done
    • Priority: L3 - Default
    • 2.7.0
    • Affects Version/s: None
    • Component/s: continuous integration
    • None

      Context:
      Currently the e2e test stage also runs a yarn build, given that we stash the client build in the initial build stage and unstash them into the e2e stage we should find a way to skip the build as it takes >1minute.

      AT:

      • yarn build is skipped in the e2e stage instead the build results from the `build` stage are unstashed
      • also consider stashing the `yarn install` output to skip this step too

        This is the controller panel for Smart Panels app

              Assignee:
              Unassigned
              Reporter:
              Sebastian Bathke
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: