Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-1169

I can upgrade Optimize

    XMLWordPrintable

Details

    • Feature Request
    • Resolution: Fixed
    • L3 - Default
    • 2.2.0
    • None
    • backend

    Description

      AT:

      • after upgrading Optimize from one minor version to the next:
        • the data from the old version is still available
        • Optimize is fully running as I would just use the newest version without the upgrade
        • changes in the data structure are updated as well
      • During the jar execution:
        • if the upgrade jar is not executed from the upgrade folder, I see a designated error message
        • If Elasticsearch is not running I see a designated error message
        • If current Elasticsearch data structure version does not correspond to the upgrade version of the jar, I see a dedicated error message.
      • I can read documentation about how to upgrade Optimize
      • Optimize is tested the following ways:
        • Deploy old schema version. Perform update script. Run normal integration tests
        • Deploy old schema. Add data (e.g. 100 000 process instances). Perform update script. import all data and check that everything is imported and the new fields have values as expected.
        • Unit tests that ensure the elasticsearch upgrade Operations perform as expected.

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              johannes.heinemann Johannes
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce