Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-1348

I can set a goal line in the process instance bar chart

    XMLWordPrintable

    Details

    • Type: Feature Request
    • Status: Done
    • Priority: L3 - Default
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 2.2.0-alpha1, 2.2.0
    • Component/s: frontend
    • Labels:
      None

      Description

      AT:

      • I can set a target value for all reports with visualization set to bar chart
      • The target can be configured like in the number report using the target double button
      • Pressing the target button the first time a modal opens where I can set the target value and if the actual values should be below or above the target value
      • Confirming the target modal draws a horizontal red line on the height of the configured target value into the bar chart
      • All bars that do not meet the target value are painted red, e.g. I set a target that all values should be below 10. If a bar is above 10 it is painted red.
      • When I press the target button again, the goal line is being removed and also all bars are painted blue as usual
      • The feature is documented in the user guide

        Attachments

          Activity

            People

            Assignee:
            Unassigned
            Reporter:
            johannes.heinemann Johannes Heinemann
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved: