Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-1523

The create report and create combined report buttons are joined into a split button

    XMLWordPrintable

Details

    • Task
    • Resolution: Fixed
    • L3 - Default
    • 2.3.0
    • None
    • None
    • None

    Description

      AT:

      • In the report list you still find the button to create a report
      • The button is divided into two parts, the left part has a label and performs the respective action on it and the right part has an arrow icon (it should look and behave similar to this)
      • when I click on the arrow I see a list of possible actions I can choose to perform
      • when I click on an entry in the list the action is performed.
      • when I click on the left button side, the respective action is performed
      • there are two options, one is "Create new BPM report", which is creating a new BPM report and redirecting me to the report builder. The other is "Create new combined Report", which is creating a new combined report and redirecting me to the combined report builder
      • the default Option is "Create new BPM report"

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              johannes.heinemann Johannes
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce