-
Task
-
Resolution: Done
-
L3 - Default
-
None
-
None
AT:
There is a Jenkins pipeline step that starts Optimize 2.1 with all reports, then upgrades to 2.2, adds all possible 2.2 reports and then upgrades to the next version ... until the current version is reached. In the end, all reports/dashboards are evaluated and it is checked that the evaluation was successful
This is the controller panel for Smart Panels app
- is duplicated by
-
OPT-1914 Add multiple version upgrade sequence support to upgrade-optimize-data
- Done