Details
-
Feature Request
-
Resolution: Fixed
-
L3 - Default
-
None
-
None
Description
AT:
- Optimize can be run with Java Runtime Environment (JRE) 11
- Officially we will support JRE 8 & 11 only as 9 and 10 already reached EOL https://www.oracle.com/technetwork/java/java-se-support-roadmap.html
- there is a nightly jenkins job running testing that the environments work
- I can read in the technical guide about the supported JRE versions
Hint:
Check out the following guide for the migration:
https://winterbe.com/posts/2018/08/29/migrate-maven-projects-to-java-11-jigsaw/
mgm-controller-panel
This is the controller panel for Smart Panels app
Attachments
Issue Links
- mentioned in
-
Page Loading...
1.
|
Upgrade to Spring 5.1.x | Done | Unassigned | |
2.
|
Nightly jenkins IT pipeline with JDK 11 | Done | Unassigned |