Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-1992

Setting goal in duration report has no influence on chart visualization when disabling point markers

    XMLWordPrintable

Details

    Description

      1. Create combined report of MIN and MAX process instance duration
      2. Disable point markers from the configurations popover
      3. Set goal marker in between both lines
      4. Realize that goal line has no infuence on visualization of lines

      Expected:
      I think in previous versions we coloured the line differnetly when a goal was not reached/reached.

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              felix.mueller Felix Mueller
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce