Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-2064

I can combine user task duration reports

    XMLWordPrintable

Details

    • Feature Request
    • Resolution: Done
    • L3 - Default
    • 2.4.0
    • None
    • frontend

    Description

      For combined reports, it is possible to select user task duration reports. These reports can be combined with other duration reports (even non usertask duration reports), given that the groupby is the same

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            There are no Sub-Tasks for this issue.

            Activity

              People

                Unassigned Unassigned
                sebastian.stamm Sebastian Stamm
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Salesforce