Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-2107

Parallelize back-end integration test execution

    XMLWordPrintable

Details

    • Task
    • Resolution: Won't Do
    • L3 - Default
    • 2.5.0-alpha2, 2.5.0
    • None
    • backend
    • None

    Description

      AT:

      • the integration tests can be executed in parallel with a hardcoded split defined in excludesFiles

      Context:
      While adding more and more tests to Optimize, the test execution pipeline tends to take a very long time. Therefore, it makes sense to parallelize the execution so that developers don't have to wait for a very long time until they get a result.

      The follow-up ticket OPT-2191 will handle the splitting of the tests in a not hardcoded fashion.

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                johannes.heinemann Johannes
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Salesforce