Parallelize back-end integration test execution

XMLWordPrintable

    • Type: Task
    • Resolution: Won't Do
    • Priority: L3 - Default
    • 2.5.0-alpha2, 2.5.0
    • Affects Version/s: None
    • Component/s: backend
    • None

      AT:

      • the integration tests can be executed in parallel with a hardcoded split defined in excludesFiles

      Context:
      While adding more and more tests to Optimize, the test execution pipeline tends to take a very long time. Therefore, it makes sense to parallelize the execution so that developers don't have to wait for a very long time until they get a result.

      The follow-up ticket OPT-2191 will handle the splitting of the tests in a not hardcoded fashion.

            Assignee:
            Unassigned
            Reporter:
            Johannes
            Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

              Created:
              Updated:
              Resolved: