User Task Reports: show only User Tasks in Flow Node configuration

XMLWordPrintable

    • Type: Task
    • Resolution: Fixed
    • Priority: L3 - Default
    • 2.5.0
    • Affects Version/s: None
    • Component/s: frontend
    • None

      AT:

      For user task duration reports only, in the Show Flow Node configuration:

      • The user cannot interact with non-usertaks flow nodes
      • The state of non-usertask flow nodes in the hiddenNodes array cannot be changed in the user task duration report configuration (except by resetting to default), meaning: It is not possible to add any non-usertask to hidden nodes and it is not possible to remove any non-usertask from hidden nodes

      Note:
      If needed an endpoint similar to Flow Node Names can be provided.

        This is the controller panel for Smart Panels app

              Assignee:
              Unassigned
              Reporter:
              Sebastian Bathke
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: