Description
Context:
We need to revamp our integration test setup in order to parallelize their execution.
In order to do that we need to provide isolated engine, elasticsearch and optimize instances for each test execution.
mgm-controller-panel
This is the controller panel for Smart Panels app
Attachments
1.
|
Use a unique elasticsearch index prefix per test |
|
Done | Unassigned |
2.
|
Dedicated engine per test |
|
Done | Unassigned |
3.
|
Unique Optimize ports for parallel testing |
|
Done | Unassigned |
4.
|
Fork IT test runs to parallelize and speedup the execution |
|
Done | Unassigned |