Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-2396

Parallelize back-end integration test execution

    XMLWordPrintable

Details

    • Task
    • Resolution: Done
    • L3 - Default
    • 2.6.0
    • None
    • backend
    • None

    Description

      Context:
      We need to revamp our integration test setup in order to parallelize their execution.
      In order to do that we need to provide isolated engine, elasticsearch and optimize instances for each test execution.

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              sebastian.bathke Sebastian Bathke
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce