XMLWordPrintable

Details

    Description

      AT:

      • The new configuration field is only available for user tasks that are grouped by flow node
      • when none is selected, the user task report stays it is right now
      • the allowed visualizations for those distributed report are bar and table
      • when userTask is selected, it will split up the count for each user and each user task, so that the result will either be a grouped bar chart or a hierarchical table
      • if a report was a pie/area chart before the configuration was switched to userTask, then the visualization is automatically changed to bar chart

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                omran.abazeed Omran Abazeed
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Salesforce