Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-3053 Event Based Import #2 Iteration
  3. OPT-3457

Remove scheduling of event based import but run it continously

    XMLWordPrintable

Details

    • Sub-task
    • Resolution: Done
    • L3 - Default
    • 3.0.0
    • 3.0.0
    • backend
    • None

    Description

      Context:
      In the event process beta we setup the import to run on a fixed interval, we rather adopt it to import as much as it can and implement the same behavior as in `EngineImportScheduler`.

      AT:

      • event based import schedulers run continously
      • the scheduler sleeps if all mediators are backing off the amount of the minimal backoff time among the mediators

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              sebastian.bathke Sebastian Bathke
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce