Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-428

I can schedule backoff for individual jobs

    XMLWordPrintable

Details

    • Feature Request
    • Resolution: Fixed
    • L3 - Default
    • 1.2.0
    • None
    • None
    • None

    Description

      • given import is running
      • when there is an OptimizeException thrown during import
      • then only the import of that specific type is backed off

      Hint
      right now all scheduling will be stopped, which is not nice.

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              askar.akhmerov Askar
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce