Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-4310

Reports can distinguish between externally canceled and BPMN event cancelled activities

    XMLWordPrintable

Details

    • Feature Request
    • Resolution: Unresolved
    • L3 - Default
    • None
    • None
    • backend, frontend
    • None
    • 3
    • Not defined

    Description

      With OPT-2428 we introduce reports that distinguish activity cancellation/interrupted states. In that there is no distinction of how the activity was cancelled (either externally or by BPMN events).

      AT:
      As a User in Optimize, I need to be able to create that show me

      • the number of times a user task/flownode has been cancelled externally
      • the number of times a user task/flownode has been cancelled by BPMN events

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                sebastian.stamm Sebastian Stamm
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                  Created:
                  Updated:

                  Salesforce