Breakup long running tests into different test classes

XMLWordPrintable

      Context:
      The overall IT stage duration on branch builds is prolonged by a very uneven test duration distribution, we have some that take a couple of seconds and others that take up to 2 minutes, given unfortunate distribution of these tests among our parallel test threads the overall duration is prolonged by some threads that unfortunately got assigned long running tests. See attached screenshot for an example.

      AT:

      • long running test classes are identified and broken up into smaller scoped test classes if feasible

        This is the controller panel for Smart Panels app

              Assignee:
              Unassigned
              Reporter:
              Sebastian Bathke
              Andromachi Rozaki Andromachi Rozaki
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

                Created:
                Updated:
                Resolved: