evaluation fails when swtiching to duration for distributed by assignee report

XMLWordPrintable

    • Type: Bug Report
    • Resolution: Fixed
    • Priority: L3 - Default
    • 3.3.0-alpha1, 3.3.0
    • Affects Version/s: None
    • Component/s: frontend
    • None
    • Not defined

      Reproduce: 

      • Create a user task count report
      • distribute the report by assignee
      • swtich the group to duration

      Observed:

      • Report fails with error notification because it is not possible to distribute duration reports by assignee

      Expected:

      • The distribution is reset and report is shown without an error

        This is the controller panel for Smart Panels app

              Assignee:
              Unassigned
              Reporter:
              Omran Abazeed
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: