Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-4517

Automatic goal line based on average value

    XMLWordPrintable

Details

    • Feature Request
    • Resolution: Unresolved
    • L3 - Default
    • None
    • None
    • None

    Description

      What is the desired functionality that you are missing?

      Assuming there are 4 assignees to a user task and following are the average time take by each user.

      User1 - 10 mins

      User 2 - 12 mins

      User 3 - 14 mins

      User 4 - 16 mins

      The mean of all of the above will be 13 mins. As a User I would like to be able to set 13 as the goal value.

      This means the goal value should be automatically calculated based on the average of the available data points if needed.

      Which problem are you going to solve with this functionality?

      I would like to easily compare the performance of team members with the average to know if they are above or below the average performance. 

      Hint

      We might also extend this to other aggregate statistics, such as percentile or median

       

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                felix.mueller Felix Mueller
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                  Created:
                  Updated:

                  Salesforce