Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-4584

adding a report with variable view to a combined report crashes optimize

XMLWordPrintable

    • Icon: Bug Report Bug Report
    • Resolution: Fixed
    • Icon: L3 - Default L3 - Default
    • 3.3.0-alpha2, 3.3.0
    • None
    • frontend
    • None
    • Not defined

      AT:

      • Create a process report with variable view
      • create another process instance count report with number visualization
      • Create a combined report
      • add one of the two created reports to the combined report

      Observed:

      • Optimize crashes

      Expected:

      • The report is added to the combined report successfully

        This is the controller panel for Smart Panels app

              Unassigned Unassigned
              omran.abazeed Omran Abazeed
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: