XMLWordPrintable

Details

    • Design Part
    • Resolution: Won't Do
    • L3 - Default
    • 3.7.0-alpha1, 3.7.0
    • None
    • None
    • None
    • 3
    • Not defined

    Description

      Compare by process start/running/end date

      Goal:
      It is possible to display start and end of processes by date. 
      When group by date is selected, It is possible to compare start, end or running with start end or running.

      *No running selection/comparison for durations

      Multiple aggregations and comparison

      Only a single aggregation can be used in comparison.

      • If multiple aggregations have been selected, a loader displays in the duration selection, and a default (Avg) is automatically selected
      (loader helps user to understand the change)

      • Aggregation pop over controls become radio buttons
      Q. Check this with Stammy

      Multiple measures and comparison 

      Theoretically we could display both but i suggest limit to one for this iteration.

      • Add comparison button is available in cases where multiple measures are selected.

      • When selected, one of the measures is removed.
        (a loader is displayed briefly to communicate this?)

      • It is not possible to add an additional measure where a comparison is selected.
      (We do not remove settings to enable the previous settings)

       

      Multiple processes and comparison 

      • Distribute by process is available for comparison reports.

      • Define further ***

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                asia.malina Asia Malina
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Salesforce