      Compare by process start/running/end date

      Goal:
      It is possible to display start and end of processes by date. 
      When group by date is selected, It is possible to compare start, end or running with start end or running.

      *No running selection/comparison for durations

      Multiple aggregations and comparison

      Only a single aggregation can be used in comparison.

      • If multiple aggregations have been selected, a loader displays in the duration selection, and a default (Avg) is automatically selected
      (loader helps user to understand the change)

      • Aggregation pop over controls become radio buttons
      Q. Check this with Stammy

      Multiple measures and comparison 

      Theoretically we could display both but i suggest limit to one for this iteration.

      • Add comparison button is available in cases where multiple measures are selected.

      • When selected, one of the measures is removed.
        (a loader is displayed briefly to communicate this?)

      • It is not possible to add an additional measure where a comparison is selected.
      (We do not remove settings to enable the previous settings)

       

      Multiple processes and comparison 

      • Distribute by process is available for comparison reports.

      • Define further ***

        This is the controller panel for Smart Panels app

            [OPT-4992] WIP Comparison by process start/running/end date

            Asia Malina added a comment -

            To do:
            Complete prototype and documentation

            Asia Malina added a comment - To do: Complete prototype and documentation

            Asia Malina added a comment -

            Feature no longer in scope. 
            a) Feature parity with combined reports no longer expected
            b) The value of comparing started can ended processes can be achieved by other means.

            Asia Malina added a comment - Feature no longer in scope.  a) Feature parity with combined reports no longer expected b) The value of comparing started can ended processes can be achieved by other means.

              Unassigned Unassigned
              asia.malina Asia Malina
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: