• Type: Sub-task
    • Resolution: Fixed
    • Priority: L3 - Default
    • 3.4.0
    • Affects Version/s: None
    • Component/s: backend
    • Not defined

      Context:
      If an Alert is created based on a number report and afterwards the number report is updated to multi measure
      The Alert in this case is based on multi measure report (it crashes the alert section currently)

      AT:

      • Return conflict response when saving a multi measure number report if there were associated alerts attached to it
      • Delete the associated Alerts on confirmation (force save)

        This is the controller panel for Smart Panels app

              Assignee:
              Unassigned
              Reporter:
              Omran Abazeed
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated:
                Resolved: