We couldn't load all Actvitity tabs. Refresh the page to try again.
If the problem persists, contact your Jira admin.
Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-5379

Combined Report with instance duration 0ms report does not format y axis

    • 3
    • S

      Problem:

      If you add a single process instance duration report that has a value of 0ms to a combined report, and then set a Goal value, the y axis of the report contains large, unformatted numbers

      Steps to reproduce:

      • Create a new Process Report
      • Configure the report so that it is a process instance duration report, grouped by none and visualized as number
      • Make sure that duration displayed is 0ms (e.g. by selecting duration, minimum)
      • Save the Report
      • Create a new combined report
      • Add the process instance duration report to the combined report
      • Set a Goal line of a couple of hours

      Actual result :

      • The y axis contains large numbers

      Expected result:

      • The y axis contains numbers formatted as durations (e.g. 5h, 10h, 15h, ...)

        This is the controller panel for Smart Panels app

            Loading...
            Uploaded image for project: 'Camunda Optimize'
            1. Camunda Optimize
            2. OPT-5379

            Combined Report with instance duration 0ms report does not format y axis

              • 3
              • S

                Problem:

                If you add a single process instance duration report that has a value of 0ms to a combined report, and then set a Goal value, the y axis of the report contains large, unformatted numbers

                Steps to reproduce:

                • Create a new Process Report
                • Configure the report so that it is a process instance duration report, grouped by none and visualized as number
                • Make sure that duration displayed is 0ms (e.g. by selecting duration, minimum)
                • Save the Report
                • Create a new combined report
                • Add the process instance duration report to the combined report
                • Set a Goal line of a couple of hours

                Actual result :

                • The y axis contains large numbers

                Expected result:

                • The y axis contains numbers formatted as durations (e.g. 5h, 10h, 15h, ...)

                  This is the controller panel for Smart Panels app

                        Unassigned Unassigned
                        sebastian.stamm Sebastian Stamm
                        Votes:
                        0 Vote for this issue
                        Watchers:
                        2 Start watching this issue

                          Created:
                          Updated:

                              Unassigned Unassigned
                              sebastian.stamm Sebastian Stamm
                              Votes:
                              0 Vote for this issue
                              Watchers:
                              2 Start watching this issue

                                Created:
                                Updated: