Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-5675

Randomize flow node start/end dates in data generator

    XMLWordPrintable

Details

    • Task
    • Resolution: Unresolved
    • L3 - Default
    • None
    • None
    • backend
    • None
    • 2
    • Not defined
    • 3 - Expected

    Description

      PROBLEM

      While process start/end dates are nicely distributed, user task and flow node dates don't make sense. For example, Stage datasets show that processes start between Jan 2018 and Jan 2020, but all user tasks were performed now (Oct 2021)

      GOAL

      Stage can be used for effective demos

      HINT

      • Distribute flow node start dates across the process instance start date window
      • Dynamically set end date based on a random time between 5 minutes and 2 days after the flow node start

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              eric.lundberg Eric Lundberg
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:

                Salesforce