Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-6599

Make flownode duration calculation in RawProcessDataResultDtoMapper calculate long durations

XMLWordPrintable

    • Icon: Bug Report Bug Report
    • Resolution: Fixed
    • Icon: L3 - Default L3 - Default
    • 3.10.0-alpha2, 3.10.0
    • None
    • None
    • None
    • Not defined

      Brief summary of the bug. What is it ? Where is it ?

      Currently in the RawProcessDataResultDtoMapper whenever we calculate flownode durations we always assume that the durations are integers and not longs

      Steps to reproduce:

      Create a raw data report for process instances whose flownodes have bug durations such that the number is a long

      Actual result:

      The raw data report crushes

      Expected result:

      The raw data report should be calculating the durations and display them in the raw data report

        This is the controller panel for Smart Panels app

              Unassigned Unassigned
              andromachi.rozaki Andromachi Rozaki
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: