Make flownode duration calculation in RawProcessDataResultDtoMapper calculate long durations

XMLWordPrintable

    • Type: Bug Report
    • Resolution: Fixed
    • Priority: L3 - Default
    • 3.10.0-alpha2, 3.10.0
    • Affects Version/s: None
    • Component/s: None
    • None
    • Not defined

      Brief summary of the bug. What is it ? Where is it ?

      Currently in the RawProcessDataResultDtoMapper whenever we calculate flownode durations we always assume that the durations are integers and not longs

      Steps to reproduce:

      Create a raw data report for process instances whose flownodes have bug durations such that the number is a long

      Actual result:

      The raw data report crushes

      Expected result:

      The raw data report should be calculating the durations and display them in the raw data report

            Assignee:
            Unassigned
            Reporter:
            Andromachi Rozaki
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: