Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-6631

Wait for iframe to load before running the e2e test

    XMLWordPrintable

Details

    • Task
    • Resolution: Fixed
    • L3 - Default
    • 3.10.0-alpha2, 3.10.0
    • None
    • frontend
    • None
    • Not defined

    Description

      Context: 
      The e2e tests for loading an external report sometimes fails on Jenkins because testcafe does not wait long enough for the iframe to load.

      AT:

      • Wait for the iframe to load or increase the selection timeout delay

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              omran.abazeed Omran Abazeed
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce