In Admin, FNI end date is not updated correctly

XMLWordPrintable

    • Type: Bug Report
    • Resolution: Fixed
    • Priority: L3 - Default
    • 7.14.0, 7.13.6
    • Affects Version/s: 7.14.0-alpha4, 7.13.6
    • Component/s: None
    • None

      Scenario:

      • Spin up engine, make sure to have some process instances started already and open Execution metrics in Admin
      • Change the end date to a time in the past where the metrics were 0.

      Expected:

      • All metrics are 0

      Observed:

      • flow node instances (FNI) metric shows the number of the previous query

      Hints:

      • The rest requests for flow node instances (FNI)is passed with the old end date
      • If you hit the refresh button the end date is updated accordingly

        This is the controller panel for Smart Panels app

              Assignee:
              Hariharan Parasuraman
              Reporter:
              Yana Vasileva
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: