Uploaded image for project: 'camunda BPM'
  1. camunda BPM
  2. CAM-12549

In Admin, FNI end date is not updated correctly

    XMLWordPrintable

Details

    • Bug Report
    • Resolution: Fixed
    • L3 - Default
    • 7.14.0, 7.13.6
    • 7.14.0-alpha4, 7.13.6
    • None
    • None

    Description

      Scenario:

      • Spin up engine, make sure to have some process instances started already and open Execution metrics in Admin
      • Change the end date to a time in the past where the metrics were 0.

      Expected:

      • All metrics are 0

      Observed:

      • flow node instances (FNI) metric shows the number of the previous query

      Hints:

      • The rest requests for flow node instances (FNI)is passed with the old end date
      • If you hit the refresh button the end date is updated accordingly

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              hariharan.parasuraman Hariharan Parasuraman
              yana.vasileva Yana Vasileva
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce