Uploaded image for project: 'camunda BPM'
  1. camunda BPM
  2. CAM-13318

I can configure a task listener as an external task

    XMLWordPrintable

Details

    • Feature Request
    • Resolution: Unresolved
    • L3 - Default
    • None
    • None
    • engine
    • None

    Description

      User Story (Required on creation):

      People using the engine remotely should have the possibility to react to user task changes (e.g. task assignment)

      Functional Requirements (Required before implementation):

      • All task event types are supported
      • When the user task completes, the external task is deleted
      • Some of the DelegateTask properties are exposed in the LockedTask that the external task client receives (minimum: the task id)

      Technical Requirements (Required before implementation):

      Limitations of Scope (Optional):

      Hints (Optional):

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                thorben.lindhauer Thorben Lindhauer
                Votes:
                1 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                  Created:
                  Updated:

                  Salesforce