-
Task
-
Resolution: Fixed
-
L3 - Default
-
None
-
None
-
None
Acceptance Criteria (Required on creation):
After the migration is performed and pipelines are used on master, we need to revise where and when to disable/enable the concurrent builds for the pipelines (master/PRs).
Changes made within ticket CAM-13398.