-
Task
-
Resolution:
Fixed
-
L3 - Default
-
-
None
-
None
-
Acceptance Criteria (Required on creation):
- Make consistent the storage of test results for e2e stages with the other stages. Store test results only for failing stages.
Hints (Optional):
This is the controller panel for Smart Panels app