Uploaded image for project: 'camunda BPM'
  1. camunda BPM
  2. CAM-14580

Document retry intervals behavior after last job retry

    XMLWordPrintable

Details

    Description

      Acceptance Criteria (Required on creation):

      • Add an item to the list at Retry Intervals explaining what happens after the last retry
        • The job will not be retried
        • The last element of the interval list will be reused to determine the next due date

      Hints (optional):

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              tobias.metzke Tobias Metzke-Bernstein
              Tobias Metzke-Bernstein Tobias Metzke-Bernstein
              Miklas Boskamp Miklas Boskamp
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce