Details
-
Feature Request
-
Resolution: Duplicate
-
L3 - Default
-
None
-
None
Description
AT
- If a BPMN 2.0 XML contains only one process - it is deployed if the "isExecutable" attribute is not set (as it is the current default and not set in a lot of test cases and existing processes)
- If a BPMN 2.0 XML contains more than one process only the ones with "isExecutable=true" are deployed to the engine, all other are skipped (even if no isExecutable flag is set)
Background: currently the engine deploys all processes with missing "isExectuable" flag. This is a show stopper for roundtrip - because the default value for this attribute is false - meaning a lot of tools do not write it to the XML for that value.
mgm-controller-panel
This is the controller panel for Smart Panels app
Attachments
Issue Links
- duplicates
-
CAM-22 The isExecutable flag is handled incorrectly by the process engine
- Closed