Convert flow type when moving tasks between pools

XMLWordPrintable

    • Type: Feature Request
    • Resolution: Won't Fix
    • Priority: L3 - Default
    • None
    • Affects Version/s: None
    • None

      As per BPMN spec no sequence flows are allowed between pools, a sequence flow should be converted into a message flow when moving a task to another pool.
      The user should get a notification with the option "do not show again".

            Assignee:
            Unassigned
            Reporter:
            Marvin Ludwig
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

              Created:
              Updated:
              Resolved: