Good Point.
Would the following implementation be acceptable?
Assuming that the task has an external form:
- The Task Details are shown on the right (in the same way as for tasks with an embedded form)
- Instead of the Form, a link / button / icon is displayed, indicating that the task has an external form.
- If the user clicks on the link / button / icon, he is redirected to the external form
Good Point.
Would the following implementation be acceptable?
Assuming that the task has an external form: