-
Feature Request
-
Resolution: Fixed
-
L3 - Default
-
None
-
None
AT:
- tasklist is included in glassfish distribution
- build structure is aligned with cycle structure
- Installation is documented on camunda.org
- Integration test
- End to end test exists in qa/[end-to-end-tests]
- Integration test exists (Login -> List -> Claim -> Check -> Logout)
- JS scenario test runs and status (GREEN / RED) is detected and reported
Open:
- Deal with data base setup / teardown at start / end of end-to-end test?
This is the controller panel for Smart Panels app
There are no Sub-Tasks for this issue.