Uploaded image for project: 'camunda BPM'
  1. camunda BPM
  2. CAM-4098

Cleanup after test run in engine integration testsuite

XMLWordPrintable

    • Icon: Task Task
    • Resolution: Duplicate
    • Icon: L3 - Default L3 - Default
    • None
    • None
    • continuous integration
    • None

      Problem:

      When a test case fails during the engine integration suite it could be that it leaves the database in a dirty state and test cases expecting a clean database fail as a direct consequence.

      AT:

      • Test cases do not fail when there are leftovers from previous failed test cases
      • Test cases are written so they only test their stuff. This means they only check for their own process definition keys etc.

        This is the controller panel for Smart Panels app

              Unassigned Unassigned
              lipphardt Christian
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: