-
Task
-
Resolution: Fixed
-
L3 - Default
-
None
-
None
Problem:
The SQLServer tests running in the DC take 5-10 times longer than in the HQ. The is probably related to the setup in the DC.
Bare metal -> KVM -> Docker -> KVM vs Bare metal -> Docker -> KVM.
AT:
- Install KVM on one of the HQ CI machines
- Setup the KVM image provided by Tim
- Run SQLServer test
- Compare build time results to plain Docker performance in the HQ. This should give us a direction in which we have to look further
This is the controller panel for Smart Panels app
- is related to
-
CAM-5262 Move SQLServer to Data Center
- Closed