Uploaded image for project: 'camunda BPM'
  1. camunda BPM
  2. CAM-5634

I want to distinguish between successfully completed and cancelled batches

XMLWordPrintable

    • Icon: Feature Request Feature Request
    • Resolution: Won't Fix
    • Icon: L3 - Default L3 - Default
    • None
    • None
    • engine

      There should be a way (other than historic job log fumbling) to determine whether a HistoricBatch was completed successfully or cancelled before.

        This is the controller panel for Smart Panels app

              Unassigned Unassigned
              thorben.lindhauer Thorben Lindhauer
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: