Uploaded image for project: 'camunda BPM'
  1. camunda BPM
  2. CAM-7173

Discussion: Is it possible to save only the failed integration jobs

    XMLWordPrintable

Details

    Description

      Hey sebastian.menski lipphardt,

      I want to discuss something.
      With the help of the database purging we can ensure that each test runs with a clean database.
      We still have random failing test cases. Maybe it will be useful that we can track all failing jobs in the history. So perhaps we can detect a pattern to fix this issues.

      I would suggest to throw the successful jobs from the history (perhaps collect only the last successful one) and save the last 5 or 10 failing jobs.

      Is this even possible and make this sense for you guys?

      Greets,
      Chris

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              christopher.zell Christopher Kujawa
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce