Details
Description
Steps to reproduce:
1) deploy a process containing a user task
2) start an instance with a date variable
3) select task in tasklist
4) click on "Load Variables"
Problem:
The date variable is shown, but the value is not visible.
Expected Behavior:
The date value is shown.
Hint:
The problem might be in using $viewValue [1].
mgm-controller-panel
This is the controller panel for Smart Panels app
Attachments
Issue Links
- duplicates
-
CAM-9241 I can see the date value in the generic tasklist form
- Closed