Create upgrade tests that upgrades all possible data

    XMLWordPrintable

Details

    • Task
    • Resolution: Fixed
    • L3 - Default
    • 2.3.0
    • None
    • backend
    • None

    Description

      Context:
      Currently in the integration tests, we start an old version of the optimize, upgrade it, and then run the integration tests. However, we don't test the upgrade with actual real life scenario data. Therefore, we should have tests, where we start an old version of Optimize, import 1000 process instances, create all possible reports, dashboard, alerts and then upgrade Optimize.

      AT:

      • it is tested that the upgrade works for all possible data in Optimize
      • before the upgrade all possible alerts, dashboards and reports are created
      • before the upgrade there are 1000 process instances generated and all the engine data is imported to Optimize
      • after the upgrade it is tested that the reports, dashboards and alerts can still be retrieved

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                johannes.heinemann Johannes
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Salesforce