Create post migration tests for optimize data upgrade testing

XMLWordPrintable

    • Type: Sub-task
    • Resolution: Fixed
    • Priority: L3 - Default
    • 2.3.0
    • Affects Version/s: None
    • Component/s: backend, testing
    • None

      After generating optimize data and executing the migration script, we need to make sure that all the optimize data can still be retrieved and evaluated.
      AT:

      • there are tests that make sure the optimize data entities are still retrievable and can be evaluated (for the reports)
      • the tests are executed through the pom script of the upgrade-data module after completing the migration

        This is the controller panel for Smart Panels app

              Assignee:
              Unassigned
              Reporter:
              Kyrylo Zakurdaiev
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: