Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-1683

I can analyze User Tasks on their idle and work time

    XMLWordPrintable

Details

    Description

      AT:

      • New View selection entries:
        • User Task
          • Idle time (Start Time - First Claim Time): we calculate work time also if we have unassign in between
          • Work time (First Claim Time-End Time): we calculate work time also if we have unassign in between
          • Total time (Start Time-End Time)
      • Visualize as: table, bar, heat
      • metrics to implement: min,max,avg,median (while avg is highest priority due being the default in first iteration)
      • we add to docs that we use first claim time and that reassigns are not reflected in the metrics

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            There are no Sub-Tasks for this issue.

            Activity

              People

                Unassigned Unassigned
                johannes.heinemann Johannes
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Salesforce