Details

    • Sub-task
    • Status: Done
    • L3 - Default
    • Resolution: Done
    • None
    • 2.4.0
    • backend

    Description

      AT:

      • an integration test pipeline is created that verifies correct behavior of Optimize in a cluster scenario (>= 2 instances)
      • scenarios to test are at least:
        1. one instance with disabled import (#1), one with enabled import (#2) (create & evaluate report through #1 works and provides results based on data imported by #2)
        2. authenticate with one instance, use cookie to access other instance successfully
        3. no existing optimize schema, concurrently start two or more optimize instances, startup succeeds although all instances concurrently try to create the schema

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                sebastian.bathke Sebastian Bathke
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Salesforce