Details

    • Type: Sub-task
    • Status: Done
    • Priority: L3 - Default
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: 2.4.0
    • Component/s: backend
    • Labels:

      Description

      AT:

      • an integration test pipeline is created that verifies correct behavior of Optimize in a cluster scenario (>= 2 instances)
      • scenarios to test are at least:
        1. one instance with disabled import (#1), one with enabled import (#2) (create & evaluate report through #1 works and provides results based on data imported by #2)
        2. authenticate with one instance, use cookie to access other instance successfully
        3. no existing optimize schema, concurrently start two or more optimize instances, startup succeeds although all instances concurrently try to create the schema

        mgm-controller-panel

        This is the controller panel for Smart Panels app

          Attachments

            Issue Links

              Activity

                People

                Assignee:
                Unassigned Unassigned
                Reporter:
                sebastian.bathke Sebastian Bathke
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                  Dates

                  Created:
                  Updated:
                  Resolved:

                    Salesforce