Wrong probability calculation in branch analysis

XMLWordPrintable

    • Type: Bug Report
    • Resolution: Fixed
    • Priority: L3 - Default
    • 3.0.0-alpha1, 3.0.0
    • Affects Version/s: None
    • Component/s: backend
    • None

      // given
      the branch analysis process

      // when
      I perform a branch analysis between Gateway_2 and the EndEvent_SubProcess (see attached screenshot)

      // then
      the calculation of the probability to reach EndEvent_SubProcess is wrong

      // expected behavior
      after passing Gateway_2 it is not possible to reach EndEvent_SubProcess. The result of the calculation must be 0% for both branches

        This is the controller panel for Smart Panels app

              Assignee:
              Unassigned
              Reporter:
              Michael Schoettes
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: