Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-3086

Allow configuring bucket for date variables

XMLWordPrintable

    • Icon: Feature Request Feature Request
    • Resolution: Duplicate
    • Icon: L3 - Default L3 - Default
    • 3.1.0
    • None
    • None
    • None

      What is the desired functionality that you are missing?

      • Currently date buckets can be only set for start & end date of process instances (e.g. group by day, month, year). It is not possible for date variables, but for those it's currently automatically adjusted.
      • It should be possible to configured the buckets for date variables, too.

      Which problem are you going to solve with this functionality?

      • As a User I want to defined how large the buckets should be - often I am not interested in granular buckets, but just look at a whole quarter or year. This is not possible for date variables yet.

        This is the controller panel for Smart Panels app

              Unassigned Unassigned
              felix.mueller Felix Mueller
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

                Created:
                Updated:
                Resolved: