-
Task
-
Resolution: Fixed
-
L3 - Default
-
None
-
None
-
12
Context:
We currently have two "large test" pipelines that are using a rather outdated large dataset (1Mio ProcessInstances) originating from a 24/7 running postgres instance. We should rather migrate them to use the data dumps generated with dumps created by the `Generate Camunda BPM test datasets` job.
These jobs are:
Upgrade performance test on large static dataset
Query performance test on large static dataset
AT:
- the mentioned pipelines use the large data dumps rather than the postgres instance
- the not required postgres instance is eventually shutdown by the INFRA team
This is the controller panel for Smart Panels app
1.
|
Add new "medium" size dataset to data-generator | Done | Unassigned | |
2.
|
Use "medium" dataset in the Query-Performance test job | Done | Unassigned | |
3.
|
Use "medium" dataset in the Upgrade-Performance test job | Done | Unassigned |