XMLWordPrintable

Details

    • Sub-task
    • Resolution: Fixed
    • L3 - Default
    • 3.0.0
    • 3.0.0
    • backend

    Description

      Context:
      Currently, you can combine two grouped by date user task reports which both have the same date unit set to automatic. It's possible that the combined report can be messed up since we don't check the overall min and max date in a combined report. Also, we should test that it's possible to combine grouped by user task start date with grouped by user task end date reports.

      AT:

      • given:
        • There are completed process instances imported which executed user tasks
        • I create a report for user task duration or frequency count
        • I select group by end date, with the options to group by automatic/year/month/day/hour/automatic etc (similar to group by start date)
        • I copy the existing report and group by start date or end date
      • when:
        • I create a combined report with the two user task date reports
        • I evaluate the combined report
      • then:
        • the creation as well as the evaluation of the combined report is successful and returns the results of the two reports
      • such that:
        • I can compare per day (hour, month, etc.) how many instances have been started or completed

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              johannes.heinemann Johannes
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce