Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-4609

Spike how we can include rollover tests as part of main IT functionality

    XMLWordPrintable

Details

    • Task
    • Resolution: Unresolved
    • L3 - Default
    • None
    • None
    • backend
    • Not defined

    Description

      We have some ITs for rollover index testing specific behaviour. It would be nice if we could include these rollover scenarios as part of the main IT for that behaviour under test. We could possibly even only test the behaviour under rollover index scenarios. Either way, we should have a mini-spike to determine how we can better structure these tests to avoid having two IT classes testing the same behaviour

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                joshua.windels Joshua Windels
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                  Created:
                  Updated:

                  Salesforce