-
Task
-
Resolution: Done
-
L3 - Default
-
None
-
None
-
None
AT:
- Submitting the telemetry must be fail-safe. It should not interfere with other engine operations. Even if the telemetry endpoint is not available, no log outputs should be written on INFO or higher.
Achieved this already in
CAM-12021andCAM-12025.